Netherlands-Rotterdam: Supply, Installation and maintenance of road safety signals (South)

Key Facts

Locations:

Rotterdam (Netherlands)

Opening and closing date:

18/04/2023 - 28/05/2023

Funds available (up to):

850,000 EUR

Challenge area:

Mobility Infrastructure

Offered by:

Gemeente Rotterdam

Background

The contract provider will be responsible for the supply, installation, maintenance and removal of road safety signals. 


Published on 23 May, 2023.